How do you install nocks and points on an arrow? - easton arrow shafts
lol I started to begin archery and want to know how to get the scores and points on the heads of the arrows to save, there are holes, so in addition to, or have a hole and glue to make or what?
PS These are the arrows with which I speak http://cgi.ebay.com/Easton-1516-Arrow-Shafts-points-nocks_W0QQitemZ280264148578QQihZ018QQcategoryZ20844QQtcZphotoQQssPageNameZWDVWQQrdZ1QQcmdZViewItem
3 comments:
In fact, if the points on the photo comes with arrows are the points Nibb. No need to insert.
The first step, it is necessary to fell the trees, if they are not in the Assembly.
Mounting:
1. Clean the inside of the shaft with alcohol and a QTIP. Soak a cotton swab in alcohol and rub the inside of the axis of the same. Then take a cloth, dip it in alcohol and clean the rod tip. Make sure to completely clean.
2. Take a piece of hot melt, heat until it melts. I do not want with super glue in sections where it becomes brittle after it heals, and you may lose the point. When it melts a little, the expansion of the hot melt in the ear. Hold the tip with pliers and a little hot rod. Put the point on the shaft and the drive shaft in REST the headland, where it cools. Once it has cooled down, have more than hot melt to the point.
3. For slots, you can super glue, usually with Fletch Tite. Insert a thin rubber ring around the pressure wave. Set the notch andagain a few times.
Adhesives, put super glue on the points and drag inside the tree
The slots have some super glue and put on the tip of the arrow.
The arrows point to the use of a wire in the limbs and tail of the slots. ) For the points (points that need some glue into an adapter. The first thing to do is to ensure that the wells, adapters and slots of grease, oil and dirt, a swab of alcohol at the end of the shaft and cam and are clean and non-Nock adapter and the resulting image is in usually sufficient to remove impurities. Glue does not hold well in oil or fat ....
The owner is a of points, you screw the adapter into an electrical outlet and do not apply heat to the pointed end (adapter); spot on some "Bohning Ferr-L-Tite 'glue (c' is a hot" glue that holds like a stick comes), (which is around the end of the adapter which does not require a lot of glue, so be careful, 1 / 4 to the adapter). Apply heat to the open end of the shaft, slide the adapter into the tree and slide it down until it goes away. keep it up until everything is cool. When the glue is cold, the item is ready.
For Nock --That must really be done first, so you can draw exactly the length of the rod along the length of the operation - you need something like Duco cement or Böhning "Fletch-Tite (Boehning specially formulated for use before Dicks aluminum and carbon fiber trees ). glue on the inside of the coat, which resembles a cup, did not need much glue here. Place the notch in the closed ( "pattern") of the shaft, which looks "sharp" end of the shaft, which probably paint removed / plastic / whatever. Turn the notch in place, the pressure on the axis, so that you are sure that the slot is oriented so that it at an angle of 90 degrees above the slot if no feathered fletching is installed , make sure you align 90 - - degrees over the slot once installed (which assumes that you are using a 3-Fletch). Hold for about 30-45 seconds until the glue time to "set "has (used the glue and create the necessary time - and if you glue, it will be a great misfortune for the cleaning, if radiations) on the axis. Be sure to keep the groove on the line or an arrow will not fly properly. Set aside on the arrow until the glue has dried, and may contain the notch of the arrow without the notch on the street.
Hope this helps.
Post a Comment